- Date 30 April 2026 (reconstructed)
- Period 1–30 April 2026
Retrospective reconstruction, written in October 2026 from the dated records-access chronology and backdated to the end of the period. No formal highlight report was issued at the time.
Date
30 April 2026 (reconstructed)
30 April 2026 (reconstructed)
Period covered
1–30 April 2026
1–30 April 2026
Status summary
FOI F260213 was answered and the stage-one complaint to HM Land Registry was not upheld. The register’s present state and what was submitted at first registration remain separate questions.
This reporting period
1 entries
Work packages
Pending authorisation
None this period.
In execution
- Records access: correspondence with public bodies and archives (no work package was formally authorised before 19 October 2026). Dated events:
- 13 Apr 2026 · HM Land Registry FOI team (F260213): formal FOI response
- 19 Apr 2026 · HM Land Registry: stage-one complaint not upheld
Completed in the period
None this period.
Products completed in the period
None this period.
Products planned but not started or completed in the period
None this period.
Corrective actions taken during the period
None this period.
Next reporting period
3 entries
Work packages (to be authorised, in execution, to be completed)
None this period.
Products to be completed in the next period
- Take the HM Land Registry complaint to stage two.
- Continue title-file retrieval and inspection requests.
- Use Cadw’s 1988 listing work as a parallel heritage stream; prepare an evidence-gap matrix.
Corrective actions to be completed during the next period
None this period.
Project and stage tolerance status
Tolerances not yet agreed by the Project Board
No tolerances had been set; no Project Board existed for the period.
Requests for change
0 raised · 0 decided · 0 pending
Raised
None this period.
Approved or rejected
None this period.
Pending
None this period.
Key issues and risks
2 items
- A first-stage refusal does not recover missing primary material.
- Correspondence can become circular unless each open question is tied to a specific record or procedure.
Lessons report (if appropriate)
None
No lessons report this period.