Archive: January 2026 Highlight Report

The Project Office › Archive › January 2026 Highlight Report

Archived 21 October 2026. Copied from the Legal Wiki (page 888, last modified 2026-10-21), where PRINCE2 records were kept until 21 October 2026. Kept word for word, except that personal names and contact details are replaced. Current product: see the product set.

This material now lives at https://projects.bucklerfamily.estate/january-2026/.

Page ID: 888 · Title: January 2026 Highlight Report · Evidence status: Not yet labelled — see the Editing Protocol · Version: 1.0.0 · Editing Protocol

Monthly Highlight Report — January 2026

Reconstructed report, backdated to month-end: see the backdating rule and carry-forward discipline.

MeasureRecorded value
Reporting periodJanuary 2026
Recorded FOI / EIR / records-access activity2 event entries
Primary control stateEvidence recovery and verification
Project stageRolling programme — evidence, title, heritage, accountability, narrative and museum preparation

1. Plan — month ahead

Open formal evidence-recovery routes for Cadw and HMLR; establish title-file retrieval; ensure failed contact channels are recorded; move the project from general enquiry to case-controlled evidence recovery.

2. Performance — end of month

The month produced two key control results (dated in the table below): direct contact failure at Cadw and the commencement of the HMLR title investigation.

3. Issues, Risks, Concerns

Contact-channel reliability became a measurable risk. The HMLR investigation also carries a deeper dependency: the project cannot test the registration history fully without access to the historic first-registration files and the documents actually used to register the titles.

FOI / records-access timestamps

Date / timeMatterControl significance
23 Jan 2026Cadw — FOIFOI request sent to both public Cadw addresses; both bounced
29 Jan 2026HM Land RegistryApplication concerning the interest said to have been left out at first registration

4. Plan Moving Forward / Next Month

In February, follow the HMLR retrieval route, record all holding responses, pursue the National Archives route, and use every institutional answer to identify the next repository rather than closing the issue at the first refusal or redirection.

Page version & change log

Current version: 1.0.0

VersionDate (UTC)Editor (human or agent name)ChangeSource / evidence
1.0.02026-10-18T15:19Zthe Executive’s Tab agentFooter standardised; no content changeEditing Protocol, 18 Oct 2026

Agents and editors: follow the Editing Protocol.

PRINCE2 7 outlines: sources · product set · archive