Business Case (digital estate)
The Project Office › Digital estate › Business Case (digital estate)
- Project Digital estate
- Stage S1 independence and consolidation
Version 1.0, 20 October 2026.
Executive summary
Do something; free plans
One register and PRINCE2 control of the estate make every later change safer at a small ongoing cost; hosting stays on free plans except existing paid storage.
Reasons
No single record of what exists
The estate carries a public record that people rely on, and much of it was built in a few weeks by several workers at once. Without one register, assets go unnoticed when they break (7 addresses were down when this register was first checked), backups are uneven, and privacy slips are hard to catch everywhere at once.
Business options
Do nothing · do the minimum · do something (chosen)
| Option | Summary | Assessment |
|---|---|---|
| Do nothing | Keep building sites ad hoc | Rising risk of silent outages, lost data and privacy leaks |
| Do the minimum | A list of sites only | Shows what exists, not whether it is safe |
| Do something (chosen) | PRINCE2-lite control of the estate: register, registers, stages, reports | Small ongoing cost; makes every later change safer |
Expected benefits
5 benefits
- Every asset known, owned (by role) and status-checked.
- Faster recovery: each site rebuildable from Git or a recorded export.
- Privacy protected across all sites by one check.
- Independence: the public record survives the loss of any single platform.
- Lower hosting waste (e.g. wasted preview builds removed on 19 Oct 2026).
Expected dis-benefits
2 dis-benefits
- Some time spent on records rather than new content.
- Change control slows quick fixes slightly.
Timescale
19 Oct – 30 Nov 2026
Stages S0–S3, 19 October to 30 November 2026 (Stage Plans).
Costs
Free plans; small costs need approval
Hosting stays on free plans except the existing paid storage. Possible small costs, each needing the Executive’s approval: an archive.org account is free; a larger hosted-wiki plan or paid hosting only if a limit is hit.
Investment appraisal
Not recorded
Not recorded
Major risks
6 risk areas
Single accounts, backups, privacy, rate limits, credential rotation, disk space on the worker machine (Risk Register).
PRINCE2 7 outlines: sources · product set · archive