Status summary
AMBER Statutory clocks on time; the press window and 18 decisions waiting on the Executive put time at risk. Five work packages completed; four of our own slips caught and corrected; every concern the Executive raised is now on the Issue Register with an owner, next action and target date. Case spend £0.00.
Work packages: GREEN 8 · AMBER 7 · RED 1 (e-book sales). Issues opened: 43 (High 22, Medium 17, Low 4). Risks registered: 19 (3 at score 15).
Decisions needed from the Executive
18 decisions · D-01 is the most urgent
| Decision | Question | Recommended option | Needed by |
|---|---|---|---|
| D-01 | Press tip-off: GO or not? | GO with version 5 as checked (Item 10 of the published agenda cited; 1,026 burials cited to the 2005 report; his words quoted; no accusation against a named person). | 22 Oct 2026, as early as possible |
| D-02 | Tell the clerk he will not attend online? | Yes: one factual line before the meeting, saying he asked to attend in person and will not join remotely. | 22 Oct 2026 12:00 |
| D-03 | Correct the “considering” line to the MP’s office? | Yes: a one-line correction in the same thread. | 23 Oct 2026 |
| D-04 | The 2016 HCR Law email on Wayback: keep public or take down? | Take the public copy out of view (keep it in the private record) and describe it on Watchtower without reproducing it. | 24 Oct 2026 |
| D-05 | ITV Wales (Nia Britton) note | Yes, as a draft for him to send, or fold her into the press GO. | 22 Oct 2026 12:00 |
| D-06 | The 4 PRINCE2 legacy pages (WP-00 to 39 breakdown, litigation sprint stage plan, Justice Plan v4, programme charter) | Keep them as archived copies under Archive on this site; no rebuild. | Next highlight report |
| D-07 | Five stale Printify Pop-Up listings | Hide them in the Printify app the same way as the four crest items (keep details; nothing deleted). | 25 Oct 2026 |
| D-08 | Corrections to the two loosely worded sent replies | Yes: short in-thread corrections. | 24 Oct 2026 |
| D-09 | Sign the Cardiff and Vale Health Board form | Sign and return it. | 31 Oct 2026 |
| D-10 | Confirm the 13 Oct General Register Office order | Confirm whether it was placed and paid. | 28 Oct 2026 |
| D-11 | Order paid copies of DSA/14/91 and DSA/8/32? | Ask the archive for a quote first, then decide. | 4 Nov 2026 |
| D-12 | Ask Glamorgan Archives for written authority to publish visit photos? | Yes: send the prepared request. | 4 Nov 2026 |
| D-13 | Parcel A field numbers / where the original estate plan is held | Supply what is known; map products stay on hold until then. | On supply |
| D-14 | Add the 12 meeting questions to the meeting site after the meeting? | Yes, after 22 Oct 19:00, marked as asked in writing. | 23 Oct 2026 |
| D-15 | Roles: Executive also Senior User; AI agent as interim Project Manager | Confirm. | Next highlight report |
| D-16 | WordPress Premium for the Legal Wiki | No for now. | Next highlight report |
| D-17 | Tolerances (time, cost, quality, scope, benefits, risk) for the project | Agree the proposed tolerances in the Project Plan, or set others. | G0, 18 Dec 2026 |
| D-18 | Older open items (homepage reply; council site unfreeze; loose email lines; Wayback name; outreach drafts; captions; playbook; Mary’s 1974 letter; marriage year; ICO complaints; Senedd; NLW/RCAHMW; VG41 email; Glamorgan booking; TNA BD 28/177) | Take them one at a time at the next review; none blocks this week’s deadlines. | Next highlight report |
This reporting period
15 entries
Work packages completed in the period
- WhatDoTheyKnow site (Part B): 7 requests, 43 messages, 17 attachments; 3 refusals; 6 of 16 deadlines missed; 254 days waited.
- Library: all 121 books as free v0.01 PDFs (42 marked thin).
- Directory: 307 Llandough and Leckwith entries; 20 out-of-area entries removed.
- farmbook: 30 profiles, 7 place plaques, 8 stories.
- Crest and arms withdrawn from every site and from the four Printify crest products; nothing deleted.
- Homepage: missing style file restored (footer at the top and stuck light theme fixed).
- Disclosure Part A inventory: 52 institutions, 257 conversations, 823 emails.
- PRINCE2 housekeeping: Issue Register (43 new entries), 18 decisions, Risk Register (19 new), Lessons Log (7 new), work package status, Daily Log, Checkpoint Report CR-2026-10-21, this report, Archive.
In execution
- Press tip-off: prepared (51 outlets, 35 emails, 23 phones, 14 forms); awaiting GO.
- Watchtower backfill to 2016: earliest items 23 Mar, 5 Apr and 16 Aug 2016; Gmail 2019–2024 pass running.
- HubSpot catch-up from Gmail: running under rate limits.
- Disclosure Part A: attachments to Wayback, wiki evidence pages, email archive gaps (about 29 emails), dartboard disclosure record.
- Reopen-loop (every 4 h), research flywheel (every 6 h), nightly drafts engine (05:30), daily site flywheel (12:00).
Corrective actions taken during the period
- Lessons PL-19 to PL-25 (our own slips) logged and applied: the 2016 thread misread; the MP reversal (settled: Doughty); “considering” was our wording; unchecked press lines.
- Every concern the Executive raised is now in the Issue Register (I-049 corrective action).
Next reporting period
7 entries
- 22 Oct 19:00: Llandough Community Council meeting, Item 10 (remote-only).
- By 26 Oct: South Wales Police internal review; Northern Ireland Office.
- By 28 Oct: HM Land Registry subject access reply.
- By 29 Oct: South Wales Police subject access reply.
- By 4 Nov: Vale of Glamorgan Council (ICO referral if nothing) and Cadw.
- Concern actions due: I-033, I-035, I-045 after the council hold (23–24 Oct); I-039 body confirmed by 28 Oct.
- HubSpot mirror of the registers (one task per open issue and decision).
Project and stage tolerance status
Tolerances not yet agreed by the Project Board (D-17)
| Tolerance area | Status this period |
|---|---|
| Time | Within for statutory clocks; at risk for the press window (D-01). |
| Cost | Within: case spend £0.00. |
| Quality | Four of our own slips this period, each corrected the same evening (PL-19 to PL-22). |
| Scope | Added: PRINCE2 records moved off the Legal Wiki to this site; HubSpot kept in sync. |
| Benefits | E-book sales 0 to date (WP-EBOOK RED). |
| Risk | 3 risks at score 15 escalated: R-036, R-037, R-038. |
| Sustainability | Not assessed. |
Requests for change
4 raised · 0 decided · 4 pending
Key issues and risks
Top 10, linked to the registers
- R-036: Defamation exposure from public wording and the press pitch (score 15). Response: role-only names, his concerns recorded as his, full wording private.
- R-037: Evidence loss before copies are made (score 15); linked to the Executive’s concern I-040.
- R-038: Gmail and connected-app limits slowing every worker (score 15); I-061.
- I-050: Press tip-off ready but not released; the window closes at the meeting, 22 Oct 19:00 (R-039, D-01).
- I-034: Meeting made remote-only after he asked to attend; he will not attend online (R-042, D-02).
- I-036: The clerk’s “unable to assist” (20 Nov 2025) and his concern that the same clerk dealt with the family’s matter in the past:.
- I-037: 1,026 burials (1994). One South Wales Echo article ran on 29 Apr 1994, p.5 ('Burial ground find sparks Romans or Dark Ages conflict': 30 skeletons, 'up to 300' burials). The 4 May 1994 meeting then agreed to keep the press away from the dig. No later Echo coverage was found for 30 Apr 1994 to Dec 1995. Planning file: the 1990 outline carried archaeology conditions 16–18; in Dec 1993 the council’s archaeological adviser wrote that condition 18 “has not been fulfilled and cannot be discharged” and recommended a breach of condition notice; the council treated 17 and 18 as discharged and work continued (May 1994).
- I-043: Subject access rights as one of the children from the case: HMLR SAR due 28 Oct, South Wales Police SAR due 29 Oct (R-026, R-028).
- I-047: Concealment concern across institutions: 257 conversations with 52 institutions, 73 with no reply, 8 statutory clocks missed (I-046).
- R-040: Single points of failure: one-person Project Board with 18 decisions waiting; one Gmail account; one working machine.
All entries: Issue Register · Risk Register.
Lessons report (if appropriate)
PL-19 to PL-25
- PL-19: Read a linked thread from its first message before saying what it contains.
- PL-20: Constituency facts come from the MP’s office’s written record, not inferred from an address. One correction, with the evidence, not two.
- PL-21: Search our own sent mail first when asked where a phrase came from.
- PL-22: Every figure and claim in outward text is checked against its source before the draft is shown.
- PL-23: Every concern goes into the issue register; full wording is held in the private control record; wording care applies to what is published, never to what is recorded.
- PL-24: Schedule one Gmail-heavy worker at a time; share the inventory file.
- PL-25: Ask what is meant before treating the record as contradicting the Executive.
Prospective fraud triggers to reopen the case
no ground meets the bar
50 experiments to 21 Oct (run 9); top grounds R3, R2 and R1 unchanged; new ground R9 ranked last; none meets the court-readiness bar (every Takhar limb at 4 or more). The full section, as the reopen-loop wrote it at 19:27 UTC, follows.
Prospective fraud triggers to reopen the case (autoresearch, updated 2026-10-21T19:27:22Z)
The record is described as it reads; where it may support a ground, that is said as a possibility. No living private individual is said to have acted dishonestly. Conduct by companies and officials is described only by what the documents show.
Test used: setting aside a judgment for fraud, per Takhar v Gracefield Developments [2019] UKSC 13, para 56, adopting RBS v Highland Financial Partners [2013] EWCA Civ 328, para 106. That needs (a) conscious and deliberate dishonesty in evidence given, a statement made or a matter concealed; (b) that this was material, meaning “an operative cause of the court’s decision”, judged “by reference to its impact on the evidence supporting the original decision”; (c) fresh evidence (no reasonable-diligence bar where fraud was not raised at trial: Takhar para 54); and (d) credible evidence that would probably have had an important influence. Each limb is scored 0–5. Court-readiness bar: 4 or more on every limb. Usual route for a Court of Appeal judgment: a fresh claim to set it aside. CPR 52.30 reopening needs “no alternative effective remedy”. Counsel must confirm.
Status: No ground meets the bar yet. They are ranked by how far each is from it (points short across the four limbs).
| # | Ground (one line) | a | b | c | d | Points short | New? |
|---|---|---|---|---|---|---|---|
| R3 | 'Clandestine registration': the farmhouse was registered separately (WA240304, Form 1C by Linklaters & Paines, edition 23 Feb 1983) while BP's own 1974 action, in which Mary (Nancy) Williams pleaded that BP's claim was barred, 'has never been finally heard'. The court was told the whole farm had been registered in November 1982. | 2 | 1 | 3 | 2 | 8 | KNOWN |
| R2 | the Executive's “REJECTED permissive occupancy ploy” point. The decisive finding was that Mary (Nancy) Williams never repudiated the letters (“she did not, however, do that”). Proof that she, or her solicitors, told BP in writing that she rejected them, while BP's case said otherwise, would hit the exact point the court said might have changed the result. | 1 | 5 | 1 | 1 | 9 | KNOWN (claim) · NEW (resolves the '1978 article') |
| R1 | The Court of Appeal answered the 'wrong company' argument only from the letters' own words that BP Properties Ltd 'had agreed to buy'; the court knew completion came only in May 1975; HM Land Registry's file adds a plan to the sale dated 23 February 1975, almost four months after those letters. If no binding agreement existed on 31 Oct 1974, BP Properties had nothing to licence. | 1 | 3 | 2 | 1 | 9 | NEW |
| R5 | The court's starting point, a 1916 tenancy of 'the whole of the farm' and BP's 'paper title to the farm', would fail for the farmhouse (Parcel A) if the 1938 Bute to WGR conveyance did not include it. | 1 | 3 | 2 | 1 | 9 | KNOWN |
| R4 | On 17-19 Sep 1974 BP Pension Trust got leave to enforce the 1962 order 'as successors in title to Western Ground Rents', on two days' notice, while its own action against her was part-heard. The WGR to BP Pension Trust conveyance is not on either HMLR first-registration file. | 1 | 3 | 1 | 1 | 10 | KNOWN parts · NEW link |
| R8 | VG41 was registered as a village green in 1970 under the Commons Registration Act 1965 (the wiki gives 16 June 1970). For Glamorgan the registration authority was Glamorgan County Council (s.2(1)(a)), and that council's own planning committee had heard Mary (Nancy) Williams, reported as Mrs M. D. Buckler, say on 19 Nov 1958 that her family's land had been 'wrongfully appropriated'. The Act's green test is 20 years' use 'as of right' by local people (s.22), not the usual 12-year waiting period, and the 1987 judgment records the farm as tenanted by the family until possession was taken on 4 July 1955. A separate route on the green, not a ground to reopen the 1987 judgment. | 1 | 0 | 2 | 1 | 12 | NEW link (the 1958 report and VG41 are each KNOWN) |
| R7 | The 1988 demolition, Cadw's missing 1988 file and the 'would have been destroyed' answers (WG 26-0010). | 1 | 0 | 2 | 0 | 13 | KNOWN |
| R6 | The letters were addressed to 'Mrs Buckler', not Mary (Nancy) Williams. | 0 | 1 | 0 | 0 | 15 | KNOWN |
| R9 | Archaeology: was knowledge of burials under the farm (1,026 recorded in 1994) held before the 1986-87 trial and kept from the court? A family email of 16 Aug 2016 first put it as a deal between BP and an archaeological firm. | 0 | 0 | 1 | 0 | 15 | KNOWN (the 1994 dig, the 1990 evaluation and the 1979 villa are on the wiki and family sites); NEW test (pre-July-1987 knowledge, scored) |
R3: detail
- (a) Conscious and deliberate dishonesty: 2/5. HM Land Registry 30 Jul 2026: WA240304 "(11) Form 1C application form from Linklaters & Paines", "(10) Copy of Register edition date 23 February 1983", "(7) Application form D23 (inside exam) and letter dated 8 April 1983". Form 1C (Co.) is titled 'Application for Registration of Freehold Land on Behalf of a Company ... Not on a Recent Purchase - with Statutory Declaration in Support' (HMSO 1967 bibliographic record; the 1983 text not seen). [1987] EWCA Civ 2: the 1974 action "has never been finally heard". HM Land Registry, 25 May 2026: "did not receive or were aware of any interest ... unaware of any dispute" (H05).
- (b) Material: an operative cause: 1/5. [1987] EWCA Civ 2: if she had acquired title by then, "she would have had an overriding interest to which the registration of BP Properties Ltd was necessarily subject". The registration date was not why she lost.
- (c) Fresh evidence (no diligence bar, Takhar para 54): 3/5. HMLR's 2026 schedule and complaint replies are new.
- (d) Credible; would probably have had an important influence: 2/5. An official anomaly, but the declaration itself has not been read.
- What cuts against it: On BP's own case she was its licensee, so a declarant could honestly treat her occupation as BP's possession. The court's words about November 1982 match the register as merged on 2 Feb 1987 (cycle 3 audit). Better routes than reopening are the Land Registration Act 2002 Sch 4 / Sch 8 and, if a declaration proves false, the Perjury Act 1911 s.5, but each still runs into the 1987 judgment. [1987] EWCA Civ 2 opens: BP 'have the paper title to the farm, and indeed since November 1982 they have been the registered proprietors'. Paper title was never in issue (the defence was adverse possession only), so the registration did not found the court's title premise (E26). Run 8 (E49): the 'small window' point fails in law. Land Registration Act 1925 s.70(1)(f) made rights 'acquired or in course of being acquired under the Limitation Acts' overriding and (g) protected persons in actual occupation; s.82 rectification has no time limit (including s.82(1)(d) fraud) and s.82(3) gives no protection against an overriding interest. Her death on 26 Mar 1983 closed no challenge period; the registration could not have cost her the case.
- The one record that would most raise the score: WA240304 item 11 (Form 1C with its statutory declaration) and item 7 (D23 and the 8 Apr 1983 letter). Already requested in the HM Land Registry subject-access/EIR email (due 28 Oct). PENDING: do not re-ask.
- New or known: KNOWN. H01 (3/5), H03, H05 in the research flywheel; wiki 'clandestine registration' pages.
R2: detail
- (a) Conscious and deliberate dishonesty: 1/5. None yet. Dishonesty would need BP to have held a written rejection while its evidence or case said there was none.
- (b) Material: an operative cause: 5/5. [1987] EWCA Civ 2: "It may be that the result would have been different if Mrs Buckler had, as soon as she learned of the letters, plainly told BP Properties Ltd that she did not accept the letters, and maintained her claims to be already the owner of the property; she did not, however, do that." Also: "in the absence of any repudiation by her of the two letters"; "Mrs Buckler therefore never expressly accepted or rejected the terms of the two letters."
- (c) Fresh evidence (no diligence bar, Takhar para 54): 1/5. The cutting cited in 2026 correspondence as a '1978 article' (image 'newspaper_open_day.jpg') carries the handwritten date "D. Telegraph 16 April 74" and a National Monuments Record (RCAHMW) stamp. It is the Daily Telegraph of 16 April 1974, six months BEFORE the letters ("The ownership of the house has been in dispute for 25 years ... my solicitors tell me I have a valid claim to it"). The letter beside it is annotated "WM 19/11/74" (William Rees, 'Grievous loss'), dating the wiki's '19 November 197?' item to 1974. European Commission of Human Rights, 14464/88 (14 Apr 1989): "The applicant appealed to the Court of Appeal, on the ground, inter alia, that the applicant's mother had not accepted the licence offered since she regarded herself as the owner." So non-acceptance was argued in 1987; only a written rejection sent to BP would be fresh.
- (d) Credible; would probably have had an important influence: 1/5. No post-4 Nov 1974 communication to BP has been found.
- What cuts against it: The court recorded that she "accepted her solicitors' advice" to do nothing while the usual 12-year waiting period from the 1962 order ran out; that evidence probably came from her own side. The argument that she never accepted the letters was made in 1987 and lost. Public statements are not the same as telling BP. The Court of Appeal judgment holds no acknowledgment of any rejection to BP Pension Trust; it records that "Mrs Buckler therefore never expressly accepted or rejected the terms of the two letters", and that the county court on 4 Nov 1974 stayed execution "pending Mrs Buckler's agreement to the proposals" before BP's solicitors withdrew the warrant (run 2, E23). The point in the 29 Jan 2026 letter to HM Land Registry that the rejection was 'acknowledged in later proceedings' needs its own source (Hollis J's judgment or the pleadings). Mary (Nancy) Williams's typed statement for the 1974 action (wiki 'Mary Williams statement', undated, probably 1974) names the 1974 defendants but mentions none of the Sept 1974 leave, the warrant, the press campaign, BP Properties or the letters, so it most likely predates 31 Oct 1974 and is not a post-letter repudiation (E27). William Rees's Western Mail letter of 19 Nov 1974 is a historian's heritage plea, not an assertion by her. Smith v Molyneaux [2016] UKPC 35 paras 28-30 (read 21 Oct 2026, run 6 E41): the Board applied Buckler, which the parties accepted, and quoted Dillon LJ's "in the absence of any repudiation by her" passage. Persuasive, not binding in England and Wales; it leaves the law as the 1987 court stated it, so only fresh-evidence (Takhar) routes remain. Run 8 (E47): RCAHMW (RC26-0375, 13 Oct 2026) holds no registered file; the C.N. Johns / Mrs Buckler correspondence is known only from a note that it 'has been lost since 1986/87', and it was with RCAHMW, not BP, so it cannot meet the 'told BP Properties' test.
- The one record that would most raise the score: Any letter from Mary (Nancy) Williams or her 1974 solicitors to BP Pension Trust, BP Properties or Linklaters & Paines between 4 Nov 1974 and 26 Mar 1983, or BP's List of Documents in the 1984-86 action. Free route: a voluntary client-file request to Hugh James (which took over Loosemores, the appellant's solicitors) by the client or his personal representative. The BP Archive email of Wed 21 Oct already asks whether BP holds a litigation file, so don't ask BP again.
- New or known: KNOWN (claim) · NEW (resolves the '1978 article'). the Executive has argued the rejection since 2025 (wiki 'Express rejection of the purported licence'). NEW: the '1978 article' is the 16 Apr 1974 Telegraph, which closes that open lead, and the RCAHMW stamp points to an NMR file (grid ref ST 1680 7331 on the card) as a further holder.
R1: detail
- (a) Conscious and deliberate dishonesty: 1/5. No document yet shows anyone knew the 'agreed to buy' words were untrue. Record: BP Pension Trust letter of 31 Oct 1974 (quoted in the judgment): "we have found such a purchaser in BP Properties Ltd, who have agreed to buy the property from the Trust". BP Properties letter, same date: "You will be hearing separately from our Pension Trust that they are selling Great House Farm to BP Properties Ltd."
- (b) Material: an operative cause: 3/5. BP Properties Ltd v Buckler [1987] EWCA Civ 2 (Dillon LJ), on argument 3: "the letters record sufficiently that BP Properties Ltd had agreed to buy the property from the Pension Trust, and BP Properties Ltd was therefore prima facie in a position to grant a licence to Mrs Buckler." The whole result then rests on BP Properties' licence: "from the time of her receipt of the letters, Mrs Buckler was in possession ... by the licence of BP Properties Ltd".
- (c) Fresh evidence (no diligence bar, Takhar para 54): 2/5. HM Land Registry letter of 30 July 2026 (ref N610CGV, S. G. Haste), WA240304 schedule: "(1) Plan to Conveyance dated 23 May 1975 ... (12) Conveyance 23 May 1975 (13) Plan to conveyance dated 23 February 1975". But the May 1975 completion was before the Court of Appeal: [1987] EWCA Civ 2 records the third argument as deriving "from the fact that the actual conveyance of the farmhouse and garden by BP Pension Trust Ltd to BP Properties Ltd did not take place until May 1975". So only the 23 Feb 1975 plan and the conveyance's recitals (unread) could be fresh. A plan prepared between an agreement and completion is ordinary conveyancing and does not by itself show that no agreement existed on 31 Oct 1974 (run 2, E22: down from 3).
- (d) Credible; would probably have had an important influence: 1/5. Catalogue entries only; the conveyance itself (and any recital of the contract date) has not been read.
- What cuts against it: The judge called it "this rather technical point". BP Pension Trust (the legal owner) wrote at the same time and plainly agreed, so a court may treat the licence as given with the owner's authority. An agreement inside the BP group need not have been written to be honest. Item 13 may be a typing slip (wiki A-071). Fraud must be shown to have been an operative cause, judged against the evidence the court relied on. The Court of Appeal already knew the conveyance was not completed until May 1975 and still held that the letters' words were enough. Law of Property Act 1925 s.40(1) (as enacted, read 20 Oct 2026) bars only an ACTION on an unwritten land contract; it does not make an oral agreement void. So an oral intra-group agreement to buy on 31 Oct 1974, written up as a conveyance in 1975, is lawful and does not by itself show the 'agreed to buy' words were untrue (E28).
- The one record that would most raise the score: WA240304 item 12 (Conveyance 23 May 1975), for any recital of the date of the contract for sale. NOT pending: the HMLR subject-access/EIR email sent 20 Oct 2026 00:30 UTC (thread D260928) asks for "Form 1C as lodged; the 1971 abstract of title; all plans and the original title plans; form D23" and correspondence, which covers item 13 (the 23 Feb 1975 plan) and item 1, but not item 12. Options: queue item 12 for a follow-up after the SAR reply (due 28 Oct; EIR part due 17 Nov), behind HMLR-Q-R25, so it is a new ask and not a repeat; or form OC2 at £11 (the Executive's decision; no spending without it).
- New or known: NEW. Wiki A-081 states BP Properties 'held only a contract to buy' and A-071 flags the item-13 date clash. No wiki page, lead or finding tests whether ANY agreement existed on 31 Oct 1974, or ties it to the Court of Appeal's answer to argument 3.
Reporting routes (options for the Executive to authorise; nothing has been reported): Action Fraud / South Wales Police; HM Land Registry’s property-fraud line; the Information Commissioner (FOIA s.77 applies only where a record was destroyed or concealed after a request was made). A solicitor’s view first is the safer order.
Sources: BP Properties Ltd v Buckler [1987] EWCA Civ 2 (BAILII) · Takhar v Gracefield Developments [2019] UKSC 13 (BAILII) · RBS v Highland Financial Partners [2013] EWCA Civ 328 (BAILII) · HM Land Registry letter, 30 July 2026 (first-registration documents, WA231076 / WA240304) · Limitation Act 1980, s.32 · CPR 52.30 · Commons Registration Act 1965, ss.2, 4, 8, 10, 22 as enacted (legislation.gov.uk) · Holbrook & Thomas, An Early-medieval Monastic Cemetery at Llandough, Glamorgan: Excavations in 1994, Medieval Archaeology 49 (2005) 1-92 (ADS eprint)
Method: one hypothesis per iteration, scored against the fixed test above; kept only if a primary source moves a score. The log is kept privately by Tab. The loop runs every 4 hours, and this section changes only when the ranking or a score changes.
Run 9 (21 Oct 2026, 19:27 UTC): one new ground, R9 (archaeology, pre-1987 knowledge), scored a0 b0 c1 d0, 15 points short, ranked last (joint with R6). R1 to R8 unchanged; top 3 unchanged: R3 (8 short), R2 (9), R1 (9). No ground meets the court-readiness bar.
R9 in one paragraph: Archaeology: was knowledge of burials under the farm (1,026 recorded in 1994) held before the 1986–87 trial and kept from the court? A family email of 16 Aug 2016 first put it as a deal between BP and an archaeological firm. The 2005 excavation report places the cemetery on the farmhouse plot, but the record shows human remains there were first found in the 1990 evaluation and the burials in 1994, after the July 1987 judgment. The pre-1987 work (1963 and 1979, south of the church) was in public and museum records. The court decided the effect of the 1974 letters, so this cannot be an operative cause. Scored and set aside on the Takhar test; the post-1987 handling of the dig stays under R7.
Kept current at /reopen-triggers/.
← HR-04 · All highlight reports